Read below for the steps you need to take to assemble the half panorama window in your sauna.
Installation of the Half Panorama Wall:
- Place the Half Panorama Wall: With two people, place the half panorama wall in the rear groove. Ensure the wall is deep in the groove.
- Secure the Window: Screw the half panorama window from below with a single 4.5x60 screw.
General Steps after Installation of the Back Wall:
Installation of Crescent Profiles:
- Place Crescent Profiles: Position a half-moon profile on the two walls, ensuring they fit into the groove of the crescent profile.
- Attach Left Half-Moon Profiles: Piece by piece, place the left half-moon profiles on the left side and screw them down with two 4.5x60 screws per half-moon profile. Use a rubber mallet for a tight fit.
- Repeat for Right Side: Repeat this process for the right half-moon profiles on the right side.
Upper Profiles Insert:
- Position Upper Profiles: Place the remaining left and right crescent profiles without screws. Leave enough space on top to allow one more profile in between.
- Remove Middle Crescent Profile: Remove the upper middle crescent profile.
- Place the Last Double Crescent Profile: Insert the last double crescent profile, using a rubber mallet to position it if necessary.
Attach Straps:
- Insert Tension Straps: Insert the tension straps and hand-tighten them. Remove the screws in the formwork up to the slipper.
- Tighten Straps: Tighten the straps and, while tightening, tap the formwork with a rubber mallet to position it correctly. Tighten the straps with an impact driver and wrench.
Attach Rain Leaders:
- Attach Rain Leaders: Secure the rain leaders to the formwork on both sides with 4.5x60 screws, placing one screw approximately every meter.
A detailed step-by-step explanation can be found in our manual.